<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0593</article-id>
      <article-id pub-id-type="publisher-id">17376</article-id>
      <title-group>
        <article-title>燃气管道定向钻穿越道路、河道防偏孔施工控制技术研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>王雪梅</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>随着城市燃气管道建设规模不断扩大，水平定向钻非开挖技术因对交通、环境影响小，在穿越城市道路、河道工程中得到广泛
应用。但在实际施工中，受地层条件复杂、设备定位偏差、操作参数不当等因素影响，导向孔偏孔问题时有发生，轻则导致管道回拖阻力
增大、防腐层损伤，重则造成地面隆起、河堤沉降甚至既有管线破坏等安全事故。本文结合多年市政燃气管道现场施工经验，系统分析了
定向钻穿越施工中偏孔问题的产生机理，从施工前准备、导向孔钻进过程控制、特殊工况处理三个层面提出了一整套防偏孔控制技术措施</p>
      </abstract>