<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Article Authoring DTD v1.4 20240229//EN" "JATS-articleauthoring1.dtd">
<article article-type="research-article" xml:lang="zh-CN" xmlns:xlink="http://www.w3.org/1999/xlink">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">58</journal-id>
      <journal-title-group>
        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="publisher-id">17313</article-id>
      <title-group>
        <article-title>抽水蓄能电站工程全过程安全管理优化研究</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>荣金涛</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>抽水蓄能电站作为新型电力系统调峰储能核心基础设施，工程涵盖上下水库、地下厂房、输水隧洞、边坡支护等多类高危施工
工序，具有地质条件复杂、施工周期长、交叉作业密集、高陡边坡与地下洞室安全风险叠加等典型特征，全过程安全管控难度显著高于常
规水利水电工程。现阶段国内多数抽水蓄能项目安全管理仍存在分段管控割裂、风险分级识别精细化不足、现场信息化监管落地滞后、分
包队伍安全履职不到位等现实问题，极易诱发坍塌、透水、高空坠落、爆破伤人等生产安全事故。本文立足抽水蓄能电站一线施工管理实
践，以工程全生命周期视角划分前期策划、现场施工、竣工验收运维衔接三大管控阶段，系统梳理当前安全管理现存短板，从风险分级防
控、数字化监管体系、分包标准化管控、应急处置机制四个维度提出优化路径，配套现场实测数据表格佐证管控措施实施成效，形成一套
适配抽水蓄能工程多工序、多风险场景的全过程安全管理方案。研究成果可直接应用于抽水蓄能项目现场安全管理工作，有效降低各类安
全事故发生率，提升水利水电施工企业安全标准化建设水平，为同类型储能电站工程安全管控提供实操参考。</p>