        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0527</article-id>
      <article-id pub-id-type="publisher-id">17308</article-id>
      <title-group>
        <article-title>变电站一次、二次设备协同检修优化技术实践探析</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>哈晓东</string-name>
        </contrib>
        <contrib contrib-type="author">
          <string-name>张维维</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>随着电网结构持续扩展、设备集成度不断提高，变电站检修工作已由单一专业分散实施逐步转向系统化、协同化和精益化管理。
一次设备承担电能输送、分配和开断等核心功能，二次设备承担保护、测控、自动化和通信等支撑任务，两者在运行逻辑、停送电条件、
风险传导路径和检修组织方式上高度耦合。传统检修模式中，常存在专业壁垒明显、计划编制割裂、停电窗口利用不足、重复开票和重复
验收较多、风险辨识不完整以及检修质量评价偏重结果轻过程等问题，直接影响设备可用率、现场安全水平和综合运维效率。基于一线运
维检修实践，文章围绕变电站一次、二次设备协同检修的组织逻辑、实施流程、关键技术和现场管控展开研究，分析当前协同检修中的难
点，提出以“系统统筹、状态融合、风险前移、流程联动、数据闭环”为核心的优化思路。通过构建联合勘查、联合停电、联合作业、联
合试验和联合验收机制，结合标准化作业票、设备状态分级、关键节点双确认和检修后评价管理，可有效压缩停电时长、减少交叉作业冲
突、提高消缺质量与试验一次通过率。</p>