        <journal-title>施工技术研究</journal-title>
        <abbrev-journal-title>Research on Construction Technology</abbrev-journal-title>
      </journal-title-group>
      <issn>ISSN: 3104-8129 EISSN: 3104-8137</issn>
      <publisher>
        <publisher-name>睿核出版社有限公司</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.65700/RHSGJSYJ01-2611-8129-0524</article-id>
      <article-id pub-id-type="publisher-id">17306</article-id>
      <title-group>
        <article-title>BIM 技术在水利枢纽工程施工全过程设计交底中的应用</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <string-name>杨金秀</string-name>
        </contrib>
      </contrib-group>
      <pub-date pub-type="epub">
        <year>2026</year>
        <month>3</month>
      </pub-date>
      <issue>3</issue>
      <abstract>
        <p>水利枢纽工程具有专业交叉多、构筑物类型复杂、施工战线长、参建单位协同难度大等特点，传统以二维图纸、会议口头说明
和纸质记录为主的设计交底方式，常存在信息传递失真、关键节点表达不清、现场理解偏差和问题反馈滞后等现实短板，直接影响施工组
织、质量控制与投资管理。为提升设计交底质量与施工执行效率，文章结合一线项目实施经验，围绕 BIM 技术在水利枢纽工程施工全过程
中的设计交底应用展开系统分析。论文从引言、应用基础、实施路径、成效评价四个方面进行论述，重点研究 BIM 模型整合、专业碰撞检
查、施工方案可视化、交底信息闭环管理及现场动态更新机制，并通过数据表对交底效率、问题发现率、返工控制和协同成效进行归纳。
研究表明，将 BIM 技术嵌入施工准备、分部开工、关键工序转换、设计变更落实和竣工复盘等全过程设计交底环节，能够显著提升交底的
直观性、完整性和可追溯性，减少图纸理解偏差，促进设计、监理、施工和业主之间的信息共享，尤其适用于厂房、泄洪建筑物、船闸、
引水系统及金结机电交叉密集区域。</p>